Net metering in Nevada: how NV Energy solar credits work in the north and south
NV Energy credits solar exports at a tiered share of the retail price, and newer customers in the north are netted every 15 minutes. Here is how it all works.
Net metering in Nevada works through NV Energy's excess energy credit: solar power you send to the grid beyond what you use is credited at a set percentage of the price of electricity, and the credit rolls forward on your bill. Customers in the current Tier 4 earn 75%, which works out to 8.717 cents per kWh for southern Nevada homes as of July 1, 2026. How your usage and exports are matched now depends on where you live and when your application was approved.
- Four tiers: NV Energy's NMR-405 rider credits exports at 95%, 88%, 81% or 75% of the price of electricity, depending on when you joined.
- North vs south: Sierra Pacific customers approved on or after October 1, 2025 are netted every 15 minutes; Nevada Power customers in the south keep monthly netting.
- Credits roll forward month to month but do not cover the basic service charge or other fixed fees.
- Demand charge ahead: southern Nevada residential customers, including solar homes, face a daily demand charge starting January 1, 2027.
- Size cap: 25 kW and no more than 100% of your annual electricity needs under NMR-405.
How net metering works in Nevada
Nevada's current system comes from 2017 legislation, AB 405, which set up declining tiers of export credit. NV Energy implements it through its NMR-405 net metering rider, which covers renewable systems of 25 kW (AC) or less. A system also cannot exceed the greater of your customer class's demand limit or 100% of your annual electricity needs.
Under NMR-405, the price used for the credit is the "Price of Electricity," made up of the base tariff energy rate, the deferred energy accounting adjustment and the base tariff general rate. Your tier then sets what share of that price you receive:
| Tier (tranche) | Share of price | Nevada Power RS credit (from July 1, 2026) | Sierra Pacific D-1 credit (from Jan 1, 2026) |
|---|---|---|---|
| Tier 1 | 95% | 11.041¢/kWh | 10.583¢/kWh |
| Tier 2 | 88% | 10.228¢/kWh | 9.804¢/kWh |
| Tier 3 | 81% | 9.414¢/kWh | 9.024¢/kWh |
| Tier 4 | 75% | 8.717¢/kWh | 8.355¢/kWh |
Tiers 1 to 3 each held 80 MW of statewide capacity and closed as they filled. According to the Western Interstate Energy Board's summary, customers keep their tier rate for 20 years. Because the credit is tied to the price of electricity, NV Energy updates the cents-per-kWh values with its quarterly rate changes. For the general idea, see net metering explained.
Monthly netting in southern Nevada
Nevada Power, which serves southern Nevada, nets usage and exports over each billing period. NV Energy's southern bill guide explains the labels you will see:
- KWHD: energy delivered to your home from the grid.
- KWHR: energy your system sent to the grid.
- KWHA: exports minus deliveries; this is the amount multiplied by your tier rate to create the excess energy credit.
Any credit not used on current charges goes into a carryover balance for later bills. The credit applies only to electricity charges, so the basic service charge, the universal energy charge, local government fees and any extra meter charges still apply. Nevada Power's residential basic service charge is $18.00 a month as of July 2026. Customers on time-of-use rates are netted separately in each time period. The NMR-405 rider also says credits cannot be applied to a minimum charge.
The 2027 daily demand charge
The Public Utilities Commission of Nevada approved a daily demand charge for Nevada Power residential and small business customers in September 2025. It bills part of your cost on your highest 15-minute use each day. NV Energy first planned to start it in April 2026; the PUCN later pushed it to January 1, 2027. NV Energy's June 2026 fact sheet says the charge applies to rooftop solar customers in southern Nevada, who may see a modest bill increase, and that the per-kWh energy rate will drop when it takes effect. For solar homes, this means evening peaks after sunset will matter more to your bill.
15-minute netting in northern Nevada
In northern Nevada, Sierra Pacific Power's NMR-405 rider closed to new customers on October 1, 2025. The PUCN approved 15-minute netting for customers whose net metering applications are approved on or after that date. Instead of matching a whole month of production against a whole month of use, NV Energy now compares imports and exports in each 15-minute window. Customers approved earlier keep monthly netting.
The practical effect: midday solar that is exported while you are away counts as an export, even if you use the same amount of energy that evening. With monthly netting, those would have canceled out. Under 15-minute netting, more of your production is likely to be valued as an export rather than as a direct offset. Ask NV Energy or your installer for the exact credit terms that apply to applications approved after October 1, 2025, since the NMR-405 tier table above covers earlier customers.
What Nevada net metering means for payback
Two numbers drive the math: the share of your solar you use on site, and the export credit for the rest. Every kWh you use as it is produced avoids the full price of electricity. Every exported kWh in Tier 4 earns 75% of that price.
A quick illustration using Nevada Power's Tier 4 rate: 400 kWh of net exports in a month earns 400 times $0.08717, or about $34.87 in bill credit. Because that credit cannot cover the $18.00 basic service charge, you will still see a bill every month. Compare Nevada prices with the national average of 18.16¢ per kWh on our Nevada electricity rates page.
Ways to keep more value
- Run pool pumps, laundry and EV charging during sunny hours to use more solar directly.
- Consider a battery if you are under 15-minute netting or face the 2027 demand charge; it can shift midday energy into the evening.
- Avoid oversizing, since the rider caps systems at 100% of annual needs and exports earn less than retail.
- Watch your carryover balance on each bill, as shown in our guide to reading a solar net metering bill.
Applying for net metering with NV Energy
- Submit your application before installing. The approval date decides which rider applies, and in the north it decides whether you get monthly or 15-minute netting.
- Keep the system within limits: 25 kW AC and no more than your annual needs under NMR-405.
- Expect an interval meter. NMR-405 requires metering that records in intervals of 15 minutes or less, which is what makes 15-minute netting and demand charges possible.
- Check your first bills for the KWHD, KWHR and carryover lines described above.
Legal challenges and what to watch
The 2025 decisions drew pushback. In November 2025, Vote Solar petitioned a Carson City district court, arguing the PUCN lacked authority for the southern Nevada demand charge and for replacing monthly netting with 15-minute netting in the north. That petition, and a separate challenge by the Attorney General's Bureau of Consumer Protection, were denied in May 2026, according to news reports. Vote Solar said in September 2026 that it has appealed to the Nevada Supreme Court.
Rules could still shift through the courts or the 2027 Legislature, so check for updates before you sign a contract and ask installers which rules their savings estimate assumes.
If you already have solar, read how net metering changes affect existing customers to understand what is and is not likely to change for you.
Next steps
Confirm with NV Energy which rider and netting interval would apply to a new application, then compare production estimates with your hourly usage. See local production data on our Nevada solar panels page, and read about the battery incentive in our guide to solar incentives in Nevada.
Frequently asked questions
Does NV Energy still offer net metering?
Yes, through excess energy credits. Customers on the NMR-405 rider are credited at 95%, 88%, 81% or 75% of the price of electricity depending on their tier, and newer northern Nevada customers are netted every 15 minutes.
What is 15-minute netting in Nevada?
It means NV Energy compares your imports and exports in each 15-minute interval instead of over the whole month. It applies to Sierra Pacific customers whose applications were approved on or after October 1, 2025.
Do NV Energy solar credits expire?
The NMR-405 rider says credits roll over to the next monthly bill and does not state an expiration. They cannot be used for the basic service charge or a minimum charge.
What size solar system can I net meter in Nevada?
Up to 25 kW AC under NV Energy's NMR-405 rider, and no more than the greater of your class demand limit or 100% of your annual electricity needs.
When does the NV Energy daily demand charge start?
The PUCN delayed the southern Nevada residential daily demand charge to January 1, 2027. It applies to rooftop solar customers as well.
Sources
- NV Energy – NMR-405 Net Metering Rider (Sierra Pacific)
- NV Energy – Nevada Power net metering rates, July 2026
- NV Energy – Sierra Pacific net metering rates, January 2026
- NV Energy – NMR-405 South bill guide
- Western Interstate Energy Board – Nevada net metering policy
- Utility Dive – Regulators approve demand charge, net metering changes for NV Energy
- Solar Power World – Nevada PUC approves shift to 15-minute netting
- KTNV – NV Energy pushes back daily demand charge again
- Vote Solar – PUC of Nevada approves delay of demand charge
- NV Energy – Daily Demand fact sheet (June 2026)
- Vote Solar – Nonprofit sues PUCN over NV Energy rate case decision (Dec 2025)
- Vote Solar – The fight isn't over (Sept 2026, appeal to Nevada Supreme Court)
- Nevada Current via News From The States – Demand charge opponents lose in court (May 2026)
Questions and comments
Be the first to ask a question or share your experience.