Net Metering in Maine: How Net Energy Billing Credits Work
Maine's net energy billing gives one kWh credit per exported kWh, used one-to-one within 12 months; 2025 changes spare on-site rooftop solar.
Net metering in Maine is called net energy billing (NEB). Under the kWh credit program, each kWh your solar sends to the grid earns one kWh credit that offsets usage one-to-one on later bills, and any credit you do not use within 12 months expires. The program is open to all electric utility customers, including those of Central Maine Power (CMP) and Versant Power.
Key takeaways
- Maine's kWh credit program gives one credit per exported kWh, applied one-to-one against later usage.
- Credits expire after 12 months on a rolling basis; CMP uses them first in, first out.
- Credits reduce kWh charges only; monthly charges that are not based on kWh still apply.
- The dollar-based tariff rate program is limited to non-residential customers.
- 2025 changes (LD 1777) target community solar and commercial projects; the new project charge is zero for resources under 1 MW.
How net metering in Maine works
Maine's rules come from state law, including Public Law 2019, chapter 478 and Public Law 2021, chapter 390, and from Chapter 313 of the Maine Public Utilities Commission (PUC) rules. The PUC runs two net energy billing programs:
- kWh credit program: available to all electric utility customers, providing kWh credits on bills.
- Tariff rate program: limited to non-residential customers, providing dollar credits at a rate set each year.
Homeowners use the kWh credit program. You can own a project on your own property, like rooftop solar, or join a shared project elsewhere in your utility's territory. Projects must be renewable generators under 5 MW.
Maine kWh credits: what they offset and when they expire
The Department of Energy Resources explains that each kWh your array sends to the grid earns one credit, and credits offset charges one-to-one in billing periods when you use more than your array produces. Unused credits expire after 12 months.
CMP's net energy billing FAQ adds useful detail:
- Generated kWh are applied against consumed kWh, which lowers your kWh consumption charges.
- Even if billable kWh reach zero, you still owe the non-kWh charges for your rate class.
- The current month's generation is applied first; banked kWh are then drawn down first in, first out.
- Banks follow a rolling 12-month period. In CMP's example, credits banked in June 2025 must be used by June 2026 or they are removed.
The Maine Office of the Public Advocate's 2026 solar guidebook makes the same point for shared solar subscribers: monthly minimum charges cannot be offset by solar credits.
A simple example of a Maine credit bank
Here is an illustration of how the rolling bank works, using CMP's first in, first out approach. The numbers are made up for the example. Say your rooftop array sends 400 more kWh to the grid than you use in June 2025. Those 400 kWh go into your bank. In July you have another 300 kWh surplus, so the bank holds 700 kWh, with the June credits at the front of the line.
In December, your home uses 500 kWh more than the panels make. CMP applies December's own production first, then draws 500 kWh from the bank, starting with the June credits. That uses all 400 June kWh and 100 of the July kWh, leaving 200 kWh in the bank. If those July credits are not used by July 2026, they are removed. Your December bill still includes the charges that are not based on kWh.
Maine net energy billing programs compared
| Feature | kWh credit program | Tariff rate program |
|---|---|---|
| Who can join | All electric utility customers | Non-residential customers only |
| Type of credit | kWh credits, one per exported kWh | Dollar credits at a PUC tariff rate |
| Credit expiry | 12 months | 12 months |
| Can bill go below zero? | No; non-kWh charges still apply | No; credits cannot take the bill below $0 |
| Rate | One kWh credit per exported kWh | Dollar rate the PUC sets for each calendar year |
Sources: Maine PUC net energy billing page and Maine energy office, checked November 2026. In December 2025 the PUC set tariff rates for each calendar year through 2046.
What the 2025 NEB law changed
LD 1777 (Public Law 2025, chapter 430) was the biggest change to Maine net energy billing in years. The legislative summary says it bars new NEB agreements after December 31, 2025 for generators connected on the utility's side of a customer's meter, adds a PUC-set monthly fee for certain kWh credit resources, sets new tariff rates for some commercial projects starting January 1, 2026, and calls for a successor program for front-of-the-meter projects.
For homeowners, two points matter. First, the new monthly fee, now called the net energy billing project charge in 35-A M.R.S. section 3209-F, is zero for resources under 1 MW, and resources wholly owned by the customers who get the credits are exempt. A typical rooftop system falls well under that size. Larger shared projects pay $2.80 or $6.00 per kW a month from January 1, 2026, depending on size. Second, the cutoff makes new off-site community solar subscriptions harder to come by. Community solar developers sued in federal court, and the court denied their request to block the project charge.
Community solar subscriptions and kWh credits
Many Maine households use kWh credits from a shared solar farm instead of panels on their own roof. The Office of the Public Advocate's 2026 guidebook explains how that works:
- Your utility applies the credits to reduce the usage on your bill, and they can be banked for up to 12 months.
- You get a separate bill from the solar company, usually 30 to 60 days after your utility bill, for the credits minus an agreed discount.
- If you pay for credits that later expire, the solar company is required to refund you.
- Cancellation periods are set by contract and often run 90 to 180 days.
- The guidebook notes that a "15%" savings figure is not required by law, so read the agreement.
Because LD 1777 cut off new net energy billing agreements for generators on the utility side of the meter after December 31, 2025, fewer new subscriptions may be offered. Existing subscribers should read any notices from their provider about the new monthly project charge.
Connecting a rooftop system to CMP or Versant
CMP's FAQ lays out the steps for customer generators:
- Your system must meet the PUC's Chapter 324 rules for parallel operation and qualify under Chapter 313.
- The inverter must meet UL 1741 or IEEE 1547.
- Sign CMP's Customer Net Energy Billing Agreement and Interconnection Agreement before operating.
- Return a signed Certificate of Completion; CMP then emails permission to operate.
- Check local permit rules with your town or city.
Versant Power customers, in the Bangor Hydro and Maine Public districts, should ask Versant for its own net energy billing and interconnection paperwork, since the steps above come from CMP.
How Maine net energy billing affects payback
Because kWh credits offset usage one-to-one, Maine's program is generous for homeowners. The main risks are timing and sizing. Summer surplus has to be used within 12 months, so a system that makes much more than you use in a year will lose credits. Plan the system around your annual use, and remember non-kWh charges stay on every bill.
You are also paying full price for a new system: the IRS says the federal Residential Clean Energy Credit is not allowed for expenditures made after December 31, 2025, and for solar the expenditure counts as made when installation is complete. Our Maine solar incentives guide covers the property tax exemption, and our explainer on true-up bills and credit expiry shows how annual resets work in general.
Next steps
Estimate output on our Maine solar panels page and read net metering explained for background. Then size your system from 12 months of bills so few credits expire.
Frequently asked questions
Does Maine have net metering?
Yes. Maine calls it net energy billing. Under the kWh credit program, each kWh you send to the grid earns a credit that offsets usage one-to-one on later bills.
Do Maine net energy billing credits expire?
Yes. Unused credits expire after 12 months. Central Maine Power tracks them on a rolling basis, so credits banked in June must be used by the following June.
Can solar credits wipe out my whole CMP bill?
No. Credits reduce kWh consumption charges, but CMP says you still owe the non-kWh charges for your rate class even when billable kWh reach zero.
Did the 2025 law change net metering for rooftop solar in Maine?
Not much. The kWh credit program is still open, and the new monthly project charge is zero for resources under 1 MW. LD 1777 mainly changes community solar and commercial projects.
Can homeowners join Maine's tariff rate program?
No. The Maine PUC limits the tariff rate program, which pays dollar credits, to non-residential customers. Homeowners use the kWh credit program.
Sources
- Maine Public Utilities Commission: Net Energy Billing
- Maine Department of Energy Resources: Solar
- Maine energy office: Solar distributed generation
- Central Maine Power: Net energy billing FAQ
- Maine Office of the Public Advocate: Solar Guidebook 2026
- Maine Legislature: Summary of LD 1777 (Public Law 2025, chapter 430)
- 35-A M.R.S. section 3209-F: Net energy billing project charge
- Climate Case Chart: Gray Yarmouth Road Solar LLC v. Maine PUC, denial of request to block project charge
- IRS: Residential Clean Energy Credit
- IRS FS-2025-05 (August 21, 2025): FAQs on the One Big Beautiful Bill Act changes to 25C, 25D and other credits
Questions and comments