Arkansas net metering now has two tiers: legacy systems keep 1:1 credits until 2040, while systems that missed the September 30, 2024 deadline earn avoided-cost credits.

Net metering in Arkansas now works two ways depending on when your system was set up. Legacy systems that met the September 30, 2024 deadline keep one-for-one kWh credits under the old rules until June 1, 2040. Newer, non-legacy systems have their exports measured separately and credited at the utility's avoided cost, which at Entergy Arkansas is 3.34 cents per kWh from March 2026 through February 2027.

  • Legacy: exported kWh offset kWh used in the month, and leftover kWh carry forward.
  • Non-legacy: imports and exports are measured separately; exports earn a dollar credit at avoided cost.
  • Credits cannot cover fixed charges: on Entergy's non-legacy tariff, credits do not reduce the customer charge, demand charge or minimum bill.
  • Rates reset every March: Entergy bases the avoided cost on the prior year's average wholesale market price in its zone.
  • Co-ops are similar but not identical: each cooperative files its own avoided cost and fees.

How net metering in Arkansas changed in 2024

Arkansas used to offer classic net metering, where your meter effectively ran backward and each exported kWh was worth as much as one you bought. Act 278 of 2023 changed that for new customers. Systems that did not finish key steps before September 30, 2024 are now billed under new rate structures.

Under state law, a legacy facility is one whose owner did one of the following before September 30, 2024:

  • submitted a standard interconnection agreement;
  • submitted a facilities agreement and paid the required interconnection construction costs; or
  • filed a complaint over a disputed facilities agreement, with the agreement and costs presented before the deadline.

Legacy facilities keep the rate structure, terms and conditions in place before the change until June 1, 2040. The statute also says they remain subject to later changes to rates, terms and conditions, so "legacy" means the crediting method is protected, not that your bill is frozen. For background on the classic model, see our net metering explainer.

Legacy net metering: how the credits work

Entergy Arkansas describes legacy billing this way:

  1. kWh your system sends to the grid offset kWh you use in the same month, and you are billed for the net.
  2. If you send more than you use, your billed net kWh is set to zero for that month.
  3. The extra kWh are banked and applied in the next billing period.
  4. You can ask Entergy to buy banked kWh that are more than 24 months old, at the avoided cost rate in its non-legacy tariff. Remaining kWh are also bought out if you leave, stop operating the system or transfer it.

First Electric Cooperative's legacy rules are similar: full retail credit, kWh credits that carry forward without expiring, and an option to cash out credits older than 24 months at avoided cost if the payout is at least $100.

Non-legacy net metering: how Arkansas avoided-cost credits work

Entergy Arkansas' Non-Legacy Net-Metering Service, Rate Schedule 71, took effect March 1, 2024. Instead of netting kWh, it measures the energy Entergy supplies to you and the energy your system feeds back as separate numbers each billing period. Then:

  • You pay for all the energy you used from the grid at your normal rate.
  • Your exports are multiplied by the avoided cost and applied as a dollar credit against the bill, but not against the customer charge, any demand charge or the minimum bill.
  • Any leftover dollar credit carries to the next billing period.
  • With at least 30 days' notice, leftover credit can be applied to other accounts you own, generally within 100 miles, in a rank order you can set once per annual billing cycle.

Entergy Arkansas avoided-cost credit by year

Each year, by February 1, Entergy files a new rate based on the prior calendar year's average MISO wholesale price for its load zone. It takes effect with the first March billing cycle and lasts twelve months.

PeriodNon-legacy export creditChange from prior year
March 2024 – February 20252.59¢/kWhFirst year of the tariff
March 2025 – February 20262.47¢/kWhDown 0.12¢
March 2026 – February 20273.34¢/kWhUp 0.87¢

Because the credit follows wholesale prices, it can rise or fall each March. That is different from states where export rates only ratchet down.

Cooperatives

At First Electric Cooperative, non-legacy members need a two-channel meter. Channel 1 records energy supplied and is billed at the tariff rate; channel 2 records excess energy, which is credited at the prior year's avoided cost filed with the Public Service Commission by Arkansas Electric Cooperative Corporation. Credits apply only to the energy charge and cannot reduce service availability, demand, taxes or fees. They carry forward month to month and do not expire.

Legacy vs. non-legacy net metering in Arkansas compared

FeatureLegacyNon-legacy
EligibilityKey steps done before Sept 30, 2024Missed the Sept 30, 2024 deadline
How exports are valuedkWh for kWh against usageDollar credit at avoided cost
BankingkWh carry forwardDollar credits carry forward
How longUntil June 1, 2040Ongoing; rate resets yearly

System size limits and fees

Entergy Arkansas' one-time interconnection fee is $196.75 per generation meter under 300 kW, plus $31.50 for each additional meter you aggregate, and you pay any study costs. Entergy says it supplies a standard two-way meter at no charge; you provide the meter socket. Ask Entergy for its current residential size limit.

First Electric Cooperative caps residential systems at 25 kW and limits output to 100% of the account's highest monthly usage in the prior 12 months. It charges a one-time $320 fee for systems up to 25 kW, and the interconnection agreement must be certified by an electrical inspector licensed by the Arkansas Department of Labor.

A worked example of a non-legacy Arkansas bill

Here is an illustration with made-up round numbers. Say a non-legacy Entergy Arkansas customer uses 900 kWh from the grid in a month and exports 400 kWh during sunny afternoons. Under Rate Schedule 71, the customer is billed for all 900 kWh at the normal rate. The 400 exported kWh earn 400 times $0.0334, or $13.36, which is applied against the bill but cannot reduce the customer charge or minimum bill. Under legacy rules, the same 400 kWh would instead have cut the billed usage to 500 kWh. Your own use, exports and rates will differ. It shows why the legacy deadline mattered so much to Arkansas solar owners.

What Arkansas net metering means for payback

For a non-legacy system, a kWh you use at home saves your full retail price, while a kWh you export earns about 3.34 cents at Entergy this year. That gap means:

  • Size for self-use. Panels that mostly export add little value.
  • Shift daytime loads. Run laundry, pool pumps and EV charging in the afternoon when you can.
  • Weigh storage carefully. A battery can move surplus into the evening; see do you need a battery with net billing.
  • Do not count on federal help. IRS guidance rules out the 25D credit for systems finished after December 31, 2025, so the avoided-cost credit and your own use carry the whole load.

Our Arkansas solar incentives guide covers the rest of the picture, and the Arkansas solar panel page shows typical output across the state.

Next steps

Ask your utility whether your home is legacy or non-legacy and for its current avoided-cost credit. Then run your bills through our solar panel calculator, valuing exports at that credit rather than your retail rate.

Frequently asked questions

Does Arkansas still have net metering?

Yes, in two forms. Legacy systems keep kWh-for-kWh crediting until June 1, 2040, while systems that applied after September 30, 2024 get avoided-cost credits for exports.

What is the Entergy Arkansas avoided cost for solar in 2026?

Entergy Arkansas' non-legacy tariff lists 3.34 cents per kWh for March 2026 through February 2027. It resets every March based on the prior year's wholesale prices.

Who qualifies for legacy net metering in Arkansas?

Owners who submitted a standard interconnection agreement, or a facilities agreement with the required costs paid, before September 30, 2024, or who had a qualifying complaint pending by that date.

Do Arkansas solar credits expire?

Entergy carries leftover credits to the next billing period, and First Electric Cooperative says credits carry forward and do not expire. Entergy legacy customers can ask to be paid for kWh older than 24 months at avoided cost.

Can solar credits pay my Entergy customer charge?

Not on the non-legacy tariff. Export credits are applied against the bill excluding the customer charge, any demand charge and the minimum bill.

Sources

Related guides

Questions and comments

Be the first to ask a question or share your experience.

Comments are checked before they appear. No links or advertising. Guidelines.

Calculators for this topic

More incentives & policy guides

All incentives & policy guides →