Incentives & Policy

Net metering in Nebraska: how solar credits work at OPPD, LES and other public utilities

Net metering in Nebraska: how solar credits work at OPPD, LES and other public utilities

Nebraska's net metering law credits surplus solar at avoided cost and pays out what is left each year. Here is how OPPD, LES and others apply it.

Net metering in Nebraska means solar power you use or net against your own consumption in a billing period offsets your retail rate, while any net surplus is credited at your utility's avoided cost. Credits carry forward through the year, and whatever is left is paid out to you at the end of each annual period. State law requires this for renewable systems of 25 kW or less, and some utilities, such as OPPD, allow larger systems.

  • Legal basis: LB 436, signed in 2009, sets net metering rules for all Nebraska local distribution utilities.
  • Surplus credit: net excess generation earns the utility's avoided cost, not the retail rate.
  • Annual payout: leftover credits are paid with the final bill of each annual period, so they do not just disappear.
  • OPPD credits surplus at 4.00 cents per kWh in summer and 3.52 cents other months, for systems up to 100 kW AC.
  • LES credits net metering surplus at a renewable rate based on its residential retail energy rate, for systems up to 25 kW AC.

How Nebraska net metering works under LB 436

Nebraska's net metering rules come from LB 436, approved by the governor on May 13, 2009. The law applies to "local distribution utilities," meaning the owners or operators of local distribution systems, which in Nebraska include public power districts and city-owned utilities.

The core rules for a qualified system:

  • It must use methane, wind, solar, biomass, hydropower or geothermal energy and be rated at 25 kW or less.
  • Energy you produce, up to your total use in a billing period, is credited at the applicable retail rate.
  • Net excess generation is credited at the utility's avoided cost of electric supply over the billing period.
  • Credits carry forward to offset future bills. Any credit left is paid out with the final bill of each annual period, or within 60 days if you end service.
  • The utility must provide bidirectional metering at no additional cost.
  • You keep the renewable energy credits your system produces.

A 2019 Nebraska Rural Electric Association explainer sums up the key difference from many states: the surplus credit is a monetary credit based on the value of power when it was generated, "not a kilowatt hour credit." For the general idea behind net metering, see net metering explained.

Nebraska net metering by utility

Utilities must meet the state minimum but can offer more. Here is how two of the largest describe their programs as of November 2026:

UtilitySize limitSurplus creditUnused credits
State minimum (LB 436)25 kWUtility's avoided costPaid out at end of annual period
OPPD (Rate 483)100 kW AC4.00¢/kWh June 1–Sept 30; 3.52¢/kWh Oct 1–May 31Carried forward; paid at end of calendar year
LES net metering25 kW ACRenewable rate based on residential retail energy rateSee LES rate schedule
LES renewable generation optionUp to 100 kW ACAll output sold to LES at a renewable rateNot a netting arrangement

OPPD

Omaha Public Power District's net metering rider, Rate 483, raised the size limit from 25 kW to 100 kW of AC nameplate capacity effective September 1, 2021. When you send OPPD more energy than you take in a billing cycle, you pay only the non-energy charges on your rate and receive a bill credit for the net excess: 4.00 cents per kWh from June 1 to September 30 and 3.52 cents per kWh from October 1 to May 31. If the credit is larger than the bill, it carries forward, and any remaining credit is paid to you at the end of the calendar year.

OPPD installs the bidirectional meter at no charge as part of its customer-owned generation process. One trade-off: customers on OPPD's Level Payment Plan are removed from it, because level pay is not available with net metering.

Lincoln Electric System

LES offers net metering for systems up to 25 kW AC, with excess energy credited at a renewable rate based on the residential retail energy rate. For systems up to 100 kW AC, LES also offers a renewable generation option in which customers sell all of their output to LES. LES reported 649 qualified net metering facilities totaling 5.2 MW DC for 2025.

For reference, LES publishes estimated avoided energy costs for planning purposes. Its November 2025 document lists an all-hours estimate of 2.436 cents per kWh for 2026, with summer (June through September) peak hours of 2 to 8 pm at 4.886 cents. LES notes these are estimates, not necessarily the rate paid.

NPPD, co-ops and city utilities

Nebraska Public Power District, rural public power districts and municipal utilities all fall under LB 436. Many set their own avoided cost rates and application rules, so ask yours for its current net metering policy and credit rate before you size a system.

Program caps and fees

LB 436 lets a utility stop adding net metering customers once total net metered capacity equals 1% of the capacity needed to meet its average aggregate monthly peak demand forecast for that year. If you are in a smaller utility's territory, ask whether it is near that cap.

The law limits what utilities can charge. You can be billed the same minimum monthly fee as other customers in your rate class, but not extra standby, capacity, demand or interconnection charges. You do pay interconnection costs beyond what normal service requires. OPPD's residential monthly service charge, for example, is $30.00 as of January 1, 2026, and solar credits do not reduce that charge.

How net metering affects solar payback in Nebraska

The big gap is between the retail rate and the avoided cost credit. A kWh you use as it is produced, or that nets against same-month usage, saves you the retail energy rate. A kWh of monthly surplus at OPPD earns 4.00 or 3.52 cents.

A quick example with OPPD's numbers: a 150 kWh surplus in August earns 150 times $0.04, or $6.00, in bill credit. In March, the same surplus earns $5.28. Neither is lost if unused, since OPPD pays out remaining credit at year end. You can compare local retail prices with the national average of 18.16¢ per kWh on our Nebraska electricity rates page.

That structure favors systems sized to cover most of your usage rather than large exporting arrays. Annual payouts reduce the risk of losing value, but they do not raise the low surplus rate.

Ways to get more value

  • Size the system to your typical monthly use, not to the largest system your roof can hold.
  • Run flexible loads, such as laundry, dishwashers and EV charging, during sunny hours.
  • Check whether your utility offers time-based rates, since summer afternoon energy is worth more in avoided cost terms.

Applying for net metering in Nebraska

  1. Ask your utility for its interconnection application. LES, for example, requires an Application for Review of Interconnection before installation.
  2. Give notice. LB 436 requires you to give the utility 60 days' notice before installation.
  3. Get the state inspection. The law requires a State Electrical Division inspection before you interconnect and operate the system.
  4. Wait for approval. At LES, you install after receiving its notice to proceed, and LES inspects the installation before you may interconnect. OPPD installs a free bidirectional meter as part of its customer-owned generation process.

Once you are running, learn to read the credit lines on your statement with our guide to reading a solar net metering bill.

Next steps

Ask your utility for its current avoided cost credit and size limit, then compare a production estimate for your roof against your monthly usage. See local solar data on our Nebraska solar panels page, and check financing options in our guide to solar incentives in Nebraska.

Frequently asked questions

Does OPPD pay for excess solar?

Yes. OPPD credits net excess generation at 4.00 cents per kWh in summer and 3.52 cents in other months, and pays any remaining credit to the customer at the end of the calendar year.

What is the net metering size limit in Nebraska?

State law covers systems of 25 kW or less, and utilities may allow larger ones. OPPD allows up to 100 kW AC, while LES net metering is for systems up to 25 kW AC.

Do net metering credits expire in Nebraska?

No. Under LB 436, credits carry forward and any remaining balance is paid out with the final bill of each annual period.

Can a Nebraska utility charge extra fees for solar?

Only the minimum monthly fee other customers in your class pay. State law bars extra standby, capacity, demand or interconnection charges, though you pay interconnection costs beyond normal service.

Who owns the renewable energy credits from my Nebraska solar system?

You do. LB 436 says the customer-generator owns the renewable energy credits from the qualified facility.

Sources

Related guides

Questions and comments

Be the first to ask a question or share your experience.

Comments are checked before they appear. No links or advertising. Guidelines.

Calculators for this topic

More incentives & policy guides

All incentives & policy guides →