Net metering in California: how the Solar Billing Plan and NEM 2.0 credits work
New California solar customers are on the Solar Billing Plan, which credits exports at hourly avoided-cost values. Older NEM 2.0 systems keep retail credits for 20 years.
Net metering in California has been replaced for new customers. Since April 15, 2023, new solar customers of PG&E, SCE and SDG&E take service on the Net Billing Tariff, which the utilities call the Solar Billing Plan. Exports are credited at hourly avoided-cost values that are usually below retail, bills are due monthly with an annual true-up, and older NEM 2.0 customers keep retail-rate credits for 20 years from interconnection.
- Who is on what: applications since April 15, 2023 go on the Solar Billing Plan; NEM 1.0 and NEM 2.0 are closed to new customers.
- How exports are valued: at CPUC Avoided Cost Calculator values that change by hour and season, highest on summer evenings.
- Nine-year lock: the original Solar Billing Plan customer keeps the plan's terms for nine years.
- Adder deadline: residential PG&E and SCE customers who interconnect before the end of 2027 get a small export adder for nine years.
- Fixed charge: a Base Services Charge of about $24 a month for most customers now appears on PG&E, SCE and SDG&E bills, and SCE says export credits cannot pay it.
Does California still have net metering?
For new rooftop systems on the three big investor-owned utilities, no. The CPUC adopted the Net Billing Tariff in Decision 22-12-056, and it applies to customers applying for interconnection since April 15, 2023. Customers who were already on NEM 1.0 or NEM 2.0 stay on those tariffs for their remaining terms. The CPUC says NEM tariffs are closed to new enrollments.
The difference is how exports are priced. Under classic net metering, explained in our net metering guide, an exported kWh is worth what you pay for a kWh. Under net billing, it is worth the utility's avoided cost at that hour, which is usually much less except on late summer evenings.
How the Solar Billing Plan works
Export credits by hour and season
The CPUC sets export values using its Avoided Cost Calculator. SCE explains that credits are higher from 4 to 9 p.m. and in summer (June to September), and lower from 6 a.m. to 4 p.m. and in winter (October to May). Since solar panels produce most of their power at midday, much of a typical system's export earns the lower values.
Required time-of-use rates
Solar Billing Plan customers must take a specific electrification time-of-use rate: E-ELEC at PG&E, TOU-D-PRIME at SCE and EV-TOU-5 at SDG&E. On TOU-D-PRIME, SCE says prices are highest on summer weekdays from 4 to 9 p.m.
Monthly bills and annual true-up
On the Solar Billing Plan, the CPUC says charges are paid monthly and extra credits roll over to later bills. Once a year, a true-up bill settles the account. If you exported more energy than you used over the year, the surplus is paid at the net surplus compensation rate, which is based on wholesale prices. SCE notes that export credits cannot cover set taxes and fees, such as the Base Services Charge.
Lock-in and the export adder
The CPUC says the original customer who interconnects under the Net Billing Tariff keeps it for nine years; customers who switch to it from NEM are not eligible for that lock. SCE adds that the export prices are fixed for nine years based on the year you started, while a buyer who later moves into the home gets the current year's prices. Residential PG&E and SCE customers who interconnect before the end of 2027 also get a small export adder for nine years. SCE, which calls it the Energy Export Bonus Credit, puts it at about $0.04 per kWh, or about $0.09 for income-qualified customers, for customers who enroll before 2028. SDG&E customers are not eligible.
Net metering in California: NEM 2.0 vs. the Solar Billing Plan
| Feature | NEM 1.0 and NEM 2.0 (legacy) | Solar Billing Plan (Net Billing Tariff) |
|---|---|---|
| Open to new customers | No | Yes, for applications since April 15, 2023 |
| Export value before true-up | Retail (import) rate | Avoided Cost Calculator values by hour |
| Surplus at true-up | Wholesale-based net surplus compensation | Wholesale-based net surplus compensation |
| Billing | Annual true-up (check your utility for monthly charges) | Charges paid monthly, with annual true-up |
| Term | NEM 2.0: 20 years from interconnection | Nine years for the original customer |
| Rate plan | Varies by utility and tariff | E-ELEC, TOU-D-PRIME or EV-TOU-5 |
The CPUC says leftover NEM surplus at true-up has been paid at roughly 2 to 3 cents per kWh. Under NEM 2.0, customers can stay on the tariff for 20 years from their interconnection date.
The Base Services Charge and solar bills
A newer change affects every residential customer of the three big utilities, solar or not. Under Assembly Bill 205, PG&E, SCE and SDG&E now bill a monthly Base Services Charge. SDG&E says the amounts are the same statewide:
- about $24 a month for most customers;
- about $12 a month for FERA and qualifying deed-restricted affordable housing customers;
- about $6 a month for CARE customers.
SDG&E began billing it in October 2025 and estimated that per-kWh delivery rates would fall by about 10%, or roughly 5 cents per kWh. For solar owners, that matters in two ways. The fixed charge cannot be offset by export credits, and a lower per-kWh price slightly reduces the value of each kWh your panels save.
What happens to NEM when you sell your home?
In 2025, Assembly Bill 942 originally proposed moving a home's existing NEM system to the current tariff when the property was sold. In July 2025, the Senate Energy, Utilities and Communications Committee amended the bill to remove that provision, PV Tech reported on July 17, 2025. Under the CPUC's rules, NEM 2.0 continues for 20 years from the system's interconnection date. A buyer of a Solar Billing Plan home, by contrast, gets the current year's export prices rather than the seller's locked prices, according to SCE.
Net metering at California municipal utilities
The CPUC rules above cover PG&E, SCE and SDG&E. City and district utilities set their own terms. SMUD, for example, said on April 27, 2026 that it would credit exports on its Solar and Storage Rate at 9.6 cents per kWh from June 1, 2026, up from 7.4 cents, and that it would revisit the rate every four years. If you are served by a municipal utility, ask for its current solar tariff before you size a system.
How the Solar Billing Plan affects payback
Under net billing, the value of solar depends on timing. Ways to improve it:
- Use midday power at home. Run laundry, pool pumps and EV charging while the panels are producing.
- Cover the 4 to 9 p.m. peak. Exports earn more then, and grid power costs more. A battery can help; see do you need a battery with net billing.
- Size carefully. The CPUC allows systems up to annual load plus 50% if you attest to the need, but extra output mostly earns avoided-cost credits.
- Budget without the federal credit. Per the IRS, the 25D credit no longer applies once installation is completed after December 31, 2025.
Our California solar incentives guide covers the property tax deadline and rebate programs, and the California solar panel page shows typical output.
Questions to ask before you sign in California
- Which utility tariff and time-of-use rate does the savings estimate use, and is it the one I will actually be on?
- What share of my solar output does the estimate assume I use at home versus export?
- Does the estimate include the Base Services Charge on every monthly bill?
- Will my system interconnect before the end of 2027 so I get the export adder, if I am a PG&E or SCE customer?
- If a battery is included, how does it charge and discharge around the 4 to 9 p.m. window?
Written answers make it far easier to compare offers and to spot an estimate built on old NEM assumptions.
Next steps
Before you sign, ask the installer which hourly export values and which rate plan its savings estimate assumes. Then check the numbers with our solar panel calculator and read how true-up bills work so the annual settlement holds no surprises.
Frequently asked questions
Is NEM 3.0 the same as the Solar Billing Plan?
Yes. The CPUC calls it the Net Billing Tariff, the utilities call it the Solar Billing Plan, and many people call it NEM 3.0. It applies to PG&E, SCE and SDG&E customers who applied for interconnection since April 15, 2023.
How long does NEM 2.0 last in California?
The CPUC says NEM 2.0 customers can stay on the tariff for 20 years from their interconnection date, or switch to the current tariff.
How much does California pay for solar exports now?
Solar Billing Plan exports are credited at CPUC Avoided Cost Calculator values that change by hour and season. Credits are highest from 4 to 9 p.m. in summer and lowest at midday in winter.
Can solar credits pay the Base Services Charge?
No. SCE says export credits cannot cover set taxes and fees such as the Base Services Charge, which is about $24 a month for most customers of PG&E, SCE and SDG&E.
Do I lose NEM 2.0 if I sell my house?
A 2025 proposal in AB 942 to move NEM systems to the current tariff on sale was removed by a Senate committee in July 2025. Under CPUC rules, NEM 2.0 runs 20 years from interconnection.
Sources
- CPUC – Net Energy Metering and Net Billing
- SCE – Solar Billing Plan FAQ
- SDG&E – Base Services Charge
- PV Tech – California AB 942 removes controversial residential PV policy (July 2025)
- SMUD – Boosts Solar and Storage compensation rate (April 27, 2026)
- IRS – FAQs on modification of sections 25C, 25D and others under P.L. 119-21
Questions and comments
Be the first to ask a question or share your experience.